Description
Pink Kota silk handwoven half saree with woven Mughal buttas and block print Jali design. Contrast border is woven with geometric buttas, with flower buttas printed along the edges.
The red crepe blouse is embroidered in silver Zari.
Gray dupatta has intricate block print and a hand-embroidered border.
SPECIFICATIONS:
Occasion: Festive
Border Type: Contrast
Fabric: Silk
Weave: Zari Kota
Craft: Hand Block Print
Lehenga Price: 65,800/-
Blouse Price: 15,800/-
Dupatta Price: 25,800/-
Care Guide
Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.
Shipping info
Domestic delivery timeline for ready to ship products is about 10-15 days.
International delivery timeline for ready to ship products is about 20-25 days.
Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.
The red crepe blouse is a striking and elegant complement to the lehenga. The blouse is adorned with exquisite embroidery in shimmering silver Zari, creating an intricate and luxurious texture.
The gray dupatta infuses subtle elegance. The fabric flows effortlessly, adorned with an intricate block print. The highlight of this dupatta is the hand-embroidered border that delicately frames the edges.
Couldn't load pickup availability
Description
Pink Kota silk handwoven half saree with woven Mughal buttas and block print Jali design. Contrast border is woven with geometric buttas, with flower buttas printed along the edges.
The red crepe blouse is embroidered in silver Zari.
Gray dupatta has intricate block print and a hand-embroidered border.
SPECIFICATIONS:
Occasion: Festive
Border Type: Contrast
Fabric: Silk
Weave: Zari Kota
Craft: Hand Block Print
Lehenga Price: 65,800/-
Blouse Price: 15,800/-
Dupatta Price: 25,800/-
Care Guide
Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.
Shipping info
Domestic delivery timeline for ready to ship products is about 10-15 days.
International delivery timeline for ready to ship products is about 20-25 days.
Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.




