1 of 5
Description

Handwoven Kanjivaram saree in coral pink featurinh paisley and Zari stripes. Contrast gray border, geometric peacock border, and kadi border. Gray pallu with intricate paisley designs.


SPECIFICATIONS:
Occasion: Wedding
Border Type: Contrast
Fabric: Silk
Weave: Kanjivaram
Saree Size: 5.5 meter
Blouse size: 80 cm

NOTE:

The blouse worn by the model in the image is only for styling purposes. The saree comes with its own unstitched blouse.

Care Guide

Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.

Shipping info

Domestic delivery timeline for ready to ship products is about 10-15 days.


International delivery timeline for ready to ship products is about 20-25 days.


Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.

Harshini

This handwoven Kanjivaram saree in brilliant coral pink is gorgeous. The saree features beautiful paisley and Zari stripes. A stunning contrast gray border, with a geometric peacock border and a kadi border, complements the brilliant pink colour.

The gray pallu is embellished with intricate paisley designs and bordered by a delicate Phool Patti (flowers with petals and leaves) border.
Regular price ₹ 118,800
Sale price ₹ 118,800 Regular price ₹ 46,800
Shipping calculated at checkout.
Size
Color: Coral
Made to Order
Description

Handwoven Kanjivaram saree in coral pink featurinh paisley and Zari stripes. Contrast gray border, geometric peacock border, and kadi border. Gray pallu with intricate paisley designs.


SPECIFICATIONS:
Occasion: Wedding
Border Type: Contrast
Fabric: Silk
Weave: Kanjivaram
Saree Size: 5.5 meter
Blouse size: 80 cm

NOTE:

The blouse worn by the model in the image is only for styling purposes. The saree comes with its own unstitched blouse.

Care Guide

Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.

Shipping info

Domestic delivery timeline for ready to ship products is about 10-15 days.


International delivery timeline for ready to ship products is about 20-25 days.


Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.

Need help? Contact us
View Product details