Description
Pure Chanderi lehenga in blue with Zari checks and subtle polka dots. Blue raw silk border and gold scallop lace.
Green silk dupatta with a blue border and rudraksha block print, with sequin hand stitching. Edges have a silk floral border.
Kanchi blouse in blue with woven Zari checks woven and Benarasi sleeves.
SPECIFICATIONS:
Occasion: Festive
Border Type: Self
Fabric: Silk
Weave: Chanderi
Lehenga Price:
Blouse Price:
Dupatta Price:
Care Guide
Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.
Shipping info
Domestic delivery timeline for ready to ship products is about 10-15 days.
International delivery timeline for ready to ship products is about 20-25 days.
Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.
A brilliant green silk dupatta with a blue border and beautiful rudraksha block print complements the set. Each design is painstakingly accented with sequin hand stitching, offering a bit of sparkle. The dupatta edges are embellished with a silk floral border, which completes the design with exquisite refinement.
The outfit is completed with a Kanchi blouse in a complementary blue backdrop, woven with classic Zari checks and embellished with sumptuous Benarasi sleeves for a statement look.
Couldn't load pickup availability
Description
Pure Chanderi lehenga in blue with Zari checks and subtle polka dots. Blue raw silk border and gold scallop lace.
Green silk dupatta with a blue border and rudraksha block print, with sequin hand stitching. Edges have a silk floral border.
Kanchi blouse in blue with woven Zari checks woven and Benarasi sleeves.
SPECIFICATIONS:
Occasion: Festive
Border Type: Self
Fabric: Silk
Weave: Chanderi
Lehenga Price:
Blouse Price:
Dupatta Price:
Care Guide
Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.
Shipping info
Domestic delivery timeline for ready to ship products is about 10-15 days.
International delivery timeline for ready to ship products is about 20-25 days.
Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.
