Description
Pure Mangalgiri silk block-printed half-saree. Light lemon-green lehenga with contrasting peach border with block-printed designs.
Peach georgette Benarasi dupatta with Zari designs and silver accents, with woven floral border.
Lemon-green Benarasi blouse with floral motifs. Sleeve edges finished with silver Zari stripes.
SPECIFICATIONS:
Occasion: Festive
Border Type: Contrast
Fabric: Silk
Craft: Hand Block Print
Lehenga Price: 42,800/-
Blouse Price: 10,000/-
Dupatta Price: 35,800/-
Care Guide
Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.
Shipping info
Domestic delivery timeline for ready to ship products is about 10-15 days.
International delivery timeline for ready to ship products is about 20-25 days.
Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.
The ensemble comes with a gorgeous peach georgette Benarasi dupatta that is elegantly adorned with sparkling Zari designs and finished with polished silver accents. Its woven floral border adds to the dupatta's beauty.
Completing the look is a lemon-green Benarasi blouse embellished with elegant floral motifs, perfectly echoing the lehenga’s aesthetic. The sleeve edges finished with silver Zari stripes offer a subtle yet striking finish.
Couldn't load pickup availability
Description
Pure Mangalgiri silk block-printed half-saree. Light lemon-green lehenga with contrasting peach border with block-printed designs.
Peach georgette Benarasi dupatta with Zari designs and silver accents, with woven floral border.
Lemon-green Benarasi blouse with floral motifs. Sleeve edges finished with silver Zari stripes.
SPECIFICATIONS:
Occasion: Festive
Border Type: Contrast
Fabric: Silk
Craft: Hand Block Print
Lehenga Price: 42,800/-
Blouse Price: 10,000/-
Dupatta Price: 35,800/-
Care Guide
Dry clean only. Store garment in a muslin cloth in a dry environment, away from sunlight. Air the textile every few months.
Shipping info
Domestic delivery timeline for ready to ship products is about 10-15 days.
International delivery timeline for ready to ship products is about 20-25 days.
Made to order products will be created in about 5-6 months. Timeline will be mentioned on confirmation of the order.
